PASCHIMANCHAL VIDYUT VITRAN
NIGAM LIMITED
Paschimanchal Vidyut Vitran Nigam limited came into existence in
July, 2003 as subsidiary company of UPPCL. The Discom covers in its
jurisdiction the areas of District Meerut, Baghpat, Ghaziabad,
Gutambudh Nagar, Bulandshahar, Muzaffarnagar, Saharanpur, Bijnor,
Moradabad, J.P. Nagar and Rampur. The Discom comprises of three
distribution zones based at Meerut, Saharanpur and Moradabad and each
is headed by and officer of the rank of Chief Engineer. The total
number of Distribution Circles and Divisions in Different Zones are
19 and 56 respectively along with 17 nos. of Test Divisions.
Besides there is one circle each for works, Stores and Civil
Construction works under direct control of the Discom Head Quarter.
The Discom comprises more then Thirty lac of consumers
with and average annual demand Rs. 3900 Crores. PVVNL has 564 of
Secondary sub-stations with an installed capacity of 6569 MVA. The
total number of distribution transformers are 135202 with a capacity
of 7600 MVA.
PVVNL is trying to implement the best
practices in the distribution system. The tools used in achieving the
commercial result include the massive disconnection drive against the
defaulting consumers, the implementation of the OTS scheme, issuance
of notices under section 3 and 5 to the defaulting consumers, bill
distribution system through post office, MRI based billing of the
consumers with load above 25 KVA and replacement of electro
mechanical meters through electronic meters and adopting anti theft
measures i.e. vigorous combing in the high line losses areas,
providing ABC conductors in Theft prone areas DT Metering, Double
Metering of the consumers, Metering with AMR’s. The Discom has
achieved the remarkable enhancement in the revenue realization and
thru rate. At the same time AT&C losses have come down by 10.43%
since 2003-04. The collection efficiency has gone as high as 97.09%
in 2008-09 as against 91.36% in 2003-04. The realization has gone up
from 1953.24 crores in 2003-04 to 3866.19 crores in 2008-09. The thru
rate has gone up by 41.82% in 2008-09 since 2003-04. The data
confirming the status for last five years are tabulated as under :—
|
S. No.
|
Year
|
Thru Rate
(In Rs.)
|
Assessment
(In Lacs
|
Realization
(In Lacs
|
Collection Efficiency
|
AT&C Losses
(%)
|
Input Energy
(MU)
|
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
|
1
|
2003-04
|
1.65
|
213807.05
|
195324.87
|
91.36
|
37.57
|
11909.25
|
|
2
|
2004-05
|
1.72
|
233208.58
|
215817.14
|
92.54
|
34.08
|
12567.44
|
|
3
|
2005-06
|
1.80
|
256686.00
|
239821.71
|
93.43
|
31.49
|
13367.45
|
|
4
|
2006-07
|
1.87
|
290797.25
|
279811.04
|
96.22
|
29.50
|
15086.01
|
|
5
|
2007-08
|
1.92
|
357753.13
|
321648.39
|
89.91
|
35.39
|
16652.16
|
|
6
|
2008-09
|
2.34
|
398208.37
|
386618.89
|
97.09
|
27.14
|
16698.62
|
|
7
|
2009-10 |
2.52
|
460663.73
|
441417.95
|
95.82
|
29.83
|
17766.44
|
|
|